May Report 2018

Dear Owners, May arrived with a thunderstorm and torrential rain after which the temperatures climbed and we saw some sunshine although the weather has still been mixed. The painting of block 7 is completed and block 6 is now underway. There are some areas in blocks 8 and 7 which need to be tidied up and as soon as we get 3 painters back this will be done. We were down to one painter for much of May as they had to go and finish other jobs which had [...]

By |2020-01-07T07:25:40+00:00June 2nd, 2018|Categories: The Governing Board|0 Comments

April Report 2018

Dear Owners, It took until almost half way through April for sunshine to arrive and for the temperatures to climb which was a welcome relief from the wind and rain we had experienced. It meant the painters were able to work faster and block 8 has been completed and block 7 is almost done. We are just over halfway through the project. Pool 1 reopened on 23 April although the small pool is still not operational as repairs to the motor are being carried out. Repairs have been made [...]

By |2020-01-07T07:26:34+00:00May 1st, 2018|Categories: The Governing Board|0 Comments

March Report 2018

Dear Owners, The challenging weather we experienced in February continued throughout March with storms Emma, Felix, Gisele and Hugo all bringing torrential rain and high winds. Although there was no flooding roof tiles on several blocks were damaged and the lights in block 4 were affected. All repairs have been carried out. The bad weather allowed Carlos time to finishing painting the garage of block 1 and to complete the garage of block 9. There are a few areas he has been unable to access because of parked cars [...]

By |2020-01-07T07:27:42+00:00April 3rd, 2018|Categories: The Governing Board|0 Comments

February Report 2018

Dear Owners, February has been challenging but mainly because of the wind and rain we have been experiencing. Pool 1 was emptied at the end of last month and, as suspected, after closer inspection the entire floor needs to be re-tiled which will cost about 5,000 euros more than originally anticipated. The work is scheduled to begin on March 12th but will be dependent on the weather being dry. It is anticipated that the work will take about 2 weeks to complete so if all goes to schedule the [...]

By |2020-01-07T07:28:40+00:00March 4th, 2018|Categories: The Governing Board|0 Comments

Painting of Terraces

Dear Owners, The company carrying out the painting of the blocks will also paint private terraces if required. The prices are as follows : 2 bed – 375 euros 3 bed 475 euros Penthouse 575 euros These prices include painting of the railings. If anyone would like to arrange for their terrace to be painted let me know and I will pass on your details to the company. Patti